Davit Decommission and Re-Install
The scope of the project was to remove a davit from a ship being decommissioned and upgrade and re-install on another vessel. MWD was tasked with the removal and upgrade of the electrical control system including the supply of a new remote control operating system to replace the existing deck mounted units.
Constant Tension Winch (4 Off)
MWD’s customer required 4 x Constant Tension winches to add to their equipment pool. The customer provided an initial wish list. MWD produced a detailed specification, options and price to allow the customer to make an informed decision on which supplier to use.